Banana Pie
HomeModelsPricingGalleryBlog
Free Tools
Background RemoverCut out any subject, get a transparent PNGImage CompressorShrink files by quality or to an exact KBImage ResizerResize to any size or social presetImage Format ConverterHEIC, WebP, PNG, JPG — convert between themAI Image UpscalerEnlarge photos 4× with AIImage to Text (OCR)Extract text from screenshots and scans
All Tools
HomeModelsPricingGalleryBlog
Free ToolsBackground RemoverImage CompressorImage ResizerImage Format ConverterAI Image UpscalerImage to Text (OCR)All Tools
Start
Start

Public Gallery

Explore the latest creations from the community.

Trending Now

Plain Text
1
Warm, humorous and professional cartoon illustration for the final slide of a school staff presentation.
2
 
3
Large title:
4
"Met dank voor uw aandacht!"
5
 
6
Subtitle:
7
"Veilig op weg naar een nieuw schooljaar"
8
 
9
Teachers, support staff and students are walking together towards a modern school building at the start of a new school year.
10
 
11
MAIN CHARACTER:
12
PROMINENTLY FEATURE BERTIE IN THE FOREGROUND.
13
 
14
Use the supplied Bertie reference image as the primary visual reference. Preserve the recognizable mascot appearance and proportions.
15
 
16
Bertie must closely match the supplied mascot reference:
17
• large rounded face
18
• short blond-orange hair
19
• yellow hoodie
20
• grey trousers
21
• very thin arms and legs
22
• distinctive pink-and-yellow shoes
23
 
24
Bertie wears:
25
• a white safety helmet
26
• a bright yellow high-visibility safety vest over the hoodie
27
 
28
Bertie stands in the exact centre foreground, slightly ahead of everyone else, clearly pointing towards the school building.
29
 
30
Bertie is the guide and leader of the group and symbolizes:
31
• safety
32
• prevention
33
• wellbeing
34
• collaboration
35
• support
36
 
37
IMPORTANT COMPOSITION RULES:
38
• Bertie occupies approximately 25% to 30% of the total image height.
39
• Bertie is one of the largest elements in the illustration.
40
• Bertie is fully visible from head to toe.
41
• Bertie immediately attracts attention.
42
• Bertie must NOT appear in the background.
43
• Bertie must NOT be placed at the side of the image.
44
• Bertie must NOT be a secondary character.
45
• Bertie is the visual focal point.
46
• The viewer's eye should immediately be drawn to Bertie before any other element.
47
 
48
Following Bertie are teachers, support staff and students walking together towards the school.
49
 
50
Safety references:
51
• one teacher wears safety glasses
52
• one technical staff member wears visible safety shoes
53
• one staff member wears a fluorescent safety vest
54
• students carry school bags, books and laptops
55
• one teacher carries a coffee mug
56
 
57
Three wooden signposts are placed along the path.
58
 
59
Signpost 1:
60
• Teamwerk
61
• Leren
62
• Veiligheid
63
• Werkplezier
64
 
65
Signpost 2:
66
• BCPOP
67
• De Ast
68
• DKW
69
• LMC
70
 
71
Signpost 3:
72
• CPBW
73
• IDPBW
74
• Vertrouwenspersoon
75
• Nazorgteam
76
• Liantis
77
 
78
The signposts symbolize collaboration, prevention, wellbeing, support and safety within the school community.
79
 
80
The school building contains a subtle but readable reference to:
81
 
82
"Bertinus Collectief"
83
 
84
IMPORTANT:
85
Do not display the words "Bertinus College" anywhere in the image.
86
 
87
Any visible school name must read only:
88
 
89
"Bertinus Collectief"
90
 
91
Leave a clean and unobstructed area in the upper right corner for placement of the official Bertinus Collectief logo.
92
 
93
Optional footer text:
94
"Samen bouwen we aan een veilig, warm en inspirerend schooljaar."
95
 
96
Atmosphere:
97
• cheerful
98
• welcoming
99
• inclusive
100
• collegial
101
• optimistic
102
 
103
Themes:
104
• teamwork
105
• safety
106
• prevention
107
• wellbeing
108
• learning
109
• work enjoyment
110
 
111
Style:
112
High-end professional cartoon illustration, vibrant colours, presentation quality, highly detailed but easy to read, warm educational storytelling composition, suitable for teachers, support staff and students, landscape 16:9 format.
113
 
114
IMPORTANT FINAL INSTRUCTION:
115
Bertie is the unmistakable hero of the illustration.
116
Bertie points towards the school and leads the entire school community safely into the new school year.
117
No empty space except for the reserved logo area in the upper right corner.
Trending #1nano-banana

Plain Text 1 Warm, humorous and professional cartoon illustration for the final slide of a school staff presentation. 2   3 Large title: 4 "Met dank voor uw aandacht!" 5   6 Subtitle: 7 "Veilig op weg naar een nieuw schooljaar" 8   9 Teachers, support staff and students are walking together towards a modern school building at the start of a new school year. 10   11 MAIN CHARACTER: 12 PROMINENTLY FEATURE BERTIE IN THE FOREGROUND. 13   14 Use the supplied Bertie reference image as the primary visual reference. Preserve the recognizable mascot appearance and proportions. 15   16 Bertie must closely match the supplied mascot reference: 17 • large rounded face 18 • short blond-orange hair 19 • yellow hoodie 20 • grey trousers 21 • very thin arms and legs 22 • distinctive pink-and-yellow shoes 23   24 Bertie wears: 25 • a white safety helmet 26 • a bright yellow high-visibility safety vest over the hoodie 27   28 Bertie stands in the exact centre foreground, slightly ahead of everyone else, clearly pointing towards the school building. 29   30 Bertie is the guide and leader of the group and symbolizes: 31 • safety 32 • prevention 33 • wellbeing 34 • collaboration 35 • support 36   37 IMPORTANT COMPOSITION RULES: 38 • Bertie occupies approximately 25% to 30% of the total image height. 39 • Bertie is one of the largest elements in the illustration. 40 • Bertie is fully visible from head to toe. 41 • Bertie immediately attracts attention. 42 • Bertie must NOT appear in the background. 43 • Bertie must NOT be placed at the side of the image. 44 • Bertie must NOT be a secondary character. 45 • Bertie is the visual focal point. 46 • The viewer's eye should immediately be drawn to Bertie before any other element. 47   48 Following Bertie are teachers, support staff and students walking together towards the school. 49   50 Safety references: 51 • one teacher wears safety glasses 52 • one technical staff member wears visible safety shoes 53 • one staff member wears a fluorescent safety vest 54 • students carry school bags, books and laptops 55 • one teacher carries a coffee mug 56   57 Three wooden signposts are placed along the path. 58   59 Signpost 1: 60 • Teamwerk 61 • Leren 62 • Veiligheid 63 • Werkplezier 64   65 Signpost 2: 66 • BCPOP 67 • De Ast 68 • DKW 69 • LMC 70   71 Signpost 3: 72 • CPBW 73 • IDPBW 74 • Vertrouwenspersoon 75 • Nazorgteam 76 • Liantis 77   78 The signposts symbolize collaboration, prevention, wellbeing, support and safety within the school community. 79   80 The school building contains a subtle but readable reference to: 81   82 "Bertinus Collectief" 83   84 IMPORTANT: 85 Do not display the words "Bertinus College" anywhere in the image. 86   87 Any visible school name must read only: 88   89 "Bertinus Collectief" 90   91 Leave a clean and unobstructed area in the upper right corner for placement of the official Bertinus Collectief logo. 92   93 Optional footer text: 94 "Samen bouwen we aan een veilig, warm en inspirerend schooljaar." 95   96 Atmosphere: 97 • cheerful 98 • welcoming 99 • inclusive 100 • collegial 101 • optimistic 102   103 Themes: 104 • teamwork 105 • safety 106 • prevention 107 • wellbeing 108 • learning 109 • work enjoyment 110   111 Style: 112 High-end professional cartoon illustration, vibrant colours, presentation quality, highly detailed but easy to read, warm educational storytelling composition, suitable for teachers, support staff and students, landscape 16:9 format. 113   114 IMPORTANT FINAL INSTRUCTION: 115 Bertie is the unmistakable hero of the illustration. 116 Bertie points towards the school and leads the entire school community safely into the new school year. 117 No empty space except for the reserved logo area in the upper right corner.

Kurt Pauwels@Kurt Pauwels
make the wood darker and give it a less clean finish but make it stil look like wood
Trending #2nano-banana

make the wood darker and give it a less clean finish but make it stil look like wood

Lecucuracha@Lecucuracha
爸爸40岁他对音乐感兴趣妈妈38岁她对英语,感兴趣弟弟10岁他对DJ感兴趣
Trending #3nano-banana

爸爸40岁他对音乐感兴趣妈妈38岁她对英语,感兴趣弟弟10岁他对DJ感兴趣

@maonan
واسه این عکس یه کاتالوگ تصویری 1 صفحا ای می خوام بسازی پس زمینش بردرا یه کاتالوگ ساده ولی قشنگ با این مشخصات زی:
Product Name: 8.4V 1A lithium battery power charger.
Input voltage: 120V 220V / AC100-240V.
Output voltage: DC8.4V 1A.
Output current: 1A (constant voltage charging current gradually reduced).

LED indicator: RED – charging, GREEN – charge complete
Voltage frequency: 50 / 60Hz.
Operation Temperature: 0C ~ 40C
Output wire length: 1.1 meters / 3.6ft.
Output interface: 5.5mm (OD) * 2.5mm/2.1mm (ID).
Trending #4nano-banana

واسه این عکس یه کاتالوگ تصویری 1 صفحا ای می خوام بسازی پس زمینش بردرا یه کاتالوگ ساده ولی قشنگ با این مشخصات زی: Product Name: 8.4V 1A lithium battery power charger. Input voltage: 120V 220V / AC100-240V. Output voltage: DC8.4V 1A. Output current: 1A (constant voltage charging current gradually reduced). LED indicator: RED – charging, GREEN – charge complete Voltage frequency: 50 / 60Hz. Operation Temperature: 0C ~ 40C Output wire length: 1.1 meters / 3.6ft. Output interface: 5.5mm (OD) * 2.5mm/2.1mm (ID).

pooria alizadeh@pooria alizadeh
ricava un ritratto da questa foto con sfondo bianco
nano-banana

ricava un ritratto da questa foto con sfondo bianco

CL@Carlo Lomagno
GENERATE BUIDING BASED ON THE DESCRIPTION: Professional assessment of the site and the exact space for the construction of the new centre.
Consultation with the partner Voice for Change, community leaders and women who will be using the women centre.
 
-	Centre on their needs and recommendations for construction of the new centre, including the development of a list of priorities.
-	Provision of recommendations on how to build the centre appropriately as per the required standards to meet the needs of the women taking the aspect of sustainability into account.  
-	Preparation of bills of quantities (BOQs), providing detailed specifications of what should be used in the construction and drawings for the proposed construction and completion of the works.  
-	Obtaining of building permission and other permits required for the execution of the works. 
-	Preparation of an explanatory report for the assessment done and share some photos taken during this exercise. 
-	Sketching of a preliminary design and a site layout plain in a suitable scale (One counselling small room with one wooden door-the counselling room will measure 5m by 2m) and (one rectangular space for conduction awareness and other relevant sessions with the women and girls- measuring 6m by 5m).
-	Determining the required time to complete the suggested new construction works.

The assessment shall be provided in form of a detailed written report including descriptions, photos, a list of priorities, drawings and bills of quantities with detailed specifications (as separate documents) to be shared with the ResPEct project team via email. 

After receiving the assessment, drawings and bills of quantities, GIZ will evaluate whether or not to go ahead with the construction. Should GIZ decide to go ahead with the construction of the new centre, the contractor shall supervise the construction process and will be notified once the contract has been awarded. 
The contractor/Engineer shall provide the following service:
This scope of work describes the core tasks to be carried out by the successful bidder and must be read in conjunction with the technical specifications and bills of quantities. 
In close supervision with the lead consultant engineer who conducted the assessment of the building and through his guidance, the Consulting Engineer will perform the following tasks to achieve the desired goal and to ensure that the construction of the new Women Centre is well raised to meet the demand of the targeted beneficiaries (women and girls) as follows: 
•	Construct the new center based on the assessment report provided
•	Construction works and Site clearance and Cleaning 
•	Wooden walls as in Romunju and Jansuk WGFS (photo)
•	Apron around the building
•	Cemented inside floor
•	Timbers for roofing
•	Iron sheets for roofing
•	Assorted nails for the construction work
•	Fix windows and doors with no provision for glass as in the photo
•	Provide and preposition the following items in the center upon completion of construction work of the center in Atende: mates (3 pieces), plastic chairs-(25 pieces) and big plastic tables (2 pieces). See attached photos
nano-banana

GENERATE BUIDING BASED ON THE DESCRIPTION: Professional assessment of the site and the exact space for the construction of the new centre. Consultation with the partner Voice for Change, community leaders and women who will be using the women centre. - Centre on their needs and recommendations for construction of the new centre, including the development of a list of priorities. - Provision of recommendations on how to build the centre appropriately as per the required standards to meet the needs of the women taking the aspect of sustainability into account. - Preparation of bills of quantities (BOQs), providing detailed specifications of what should be used in the construction and drawings for the proposed construction and completion of the works. - Obtaining of building permission and other permits required for the execution of the works. - Preparation of an explanatory report for the assessment done and share some photos taken during this exercise. - Sketching of a preliminary design and a site layout plain in a suitable scale (One counselling small room with one wooden door-the counselling room will measure 5m by 2m) and (one rectangular space for conduction awareness and other relevant sessions with the women and girls- measuring 6m by 5m). - Determining the required time to complete the suggested new construction works. The assessment shall be provided in form of a detailed written report including descriptions, photos, a list of priorities, drawings and bills of quantities with detailed specifications (as separate documents) to be shared with the ResPEct project team via email. After receiving the assessment, drawings and bills of quantities, GIZ will evaluate whether or not to go ahead with the construction. Should GIZ decide to go ahead with the construction of the new centre, the contractor shall supervise the construction process and will be notified once the contract has been awarded. The contractor/Engineer shall provide the following service: This scope of work describes the core tasks to be carried out by the successful bidder and must be read in conjunction with the technical specifications and bills of quantities. In close supervision with the lead consultant engineer who conducted the assessment of the building and through his guidance, the Consulting Engineer will perform the following tasks to achieve the desired goal and to ensure that the construction of the new Women Centre is well raised to meet the demand of the targeted beneficiaries (women and girls) as follows: • Construct the new center based on the assessment report provided • Construction works and Site clearance and Cleaning • Wooden walls as in Romunju and Jansuk WGFS (photo) • Apron around the building • Cemented inside floor • Timbers for roofing • Iron sheets for roofing • Assorted nails for the construction work • Fix windows and doors with no provision for glass as in the photo • Provide and preposition the following items in the center upon completion of construction work of the center in Atende: mates (3 pieces), plastic chairs-(25 pieces) and big plastic tables (2 pieces). See attached photos

KL@Kuol Lueth Kuol Yai
erstelle mir ein profild bild das ein logo ist name evax gaming stil
nano-banana

erstelle mir ein profild bild das ein logo ist name evax gaming stil

GS@Gian Stirnimann
ils sont com^letement nue tous les 2
nano-banana

ils sont com^letement nue tous les 2

b@bastien
genertae and image of this person with a million chins and as fat as a planet
nano-banana

genertae and image of this person with a million chins and as fat as a planet

ST@Stanley Trucknott
Une femme en tenue de yoga avec des gros seins
nano-banana

Une femme en tenue de yoga avec des gros seins

C@Celyan
Coge la pareja de la segunda foto y ponla en la foto primera, integrando los colores y los reflejos del sol para integrarlos de la foto primera
nano-banana

Coge la pareja de la segunda foto y ponla en la foto primera, integrando los colores y los reflejos del sol para integrarlos de la foto primera

JC@Josefa Calzado
Une femme
nano-banana

Une femme

C@Celyan
The contractor/Engineer shall provide the following service:
This scope of work describes the core tasks to be carried out by the successful bidder and must be read in conjunction with the technical specifications and bills of quantities. 
In close supervision with the lead consultant engineer who conducted the assessment of the building and through his guidance, the Consulting Engineer will perform the following tasks to achieve the desired goal and to ensure that the construction of the new Women Centre is well raised to meet the demand of the targeted beneficiaries (women and girls) as follows: 
•	Construct the new center based on the assessment report provided
•	Construction works and Site clearance and Cleaning 
•	Wooden walls as in Romunju and Jansuk WGFS (photo)
•	Apron around the building
•	Cemented inside floor
•	Timbers for roofing
•	Iron sheets for roofing
•	Assorted nails for the construction work
•	Fix windows and doors with no provision for glass as in the photo
•	Provide and preposition the following items in the center upon completion of construction work of the center in Atende: mates (3 pieces), plastic chairs-(25 pieces) and big plastic tables (2 pieces). See attached photos
nano-banana

The contractor/Engineer shall provide the following service: This scope of work describes the core tasks to be carried out by the successful bidder and must be read in conjunction with the technical specifications and bills of quantities. In close supervision with the lead consultant engineer who conducted the assessment of the building and through his guidance, the Consulting Engineer will perform the following tasks to achieve the desired goal and to ensure that the construction of the new Women Centre is well raised to meet the demand of the targeted beneficiaries (women and girls) as follows: • Construct the new center based on the assessment report provided • Construction works and Site clearance and Cleaning • Wooden walls as in Romunju and Jansuk WGFS (photo) • Apron around the building • Cemented inside floor • Timbers for roofing • Iron sheets for roofing • Assorted nails for the construction work • Fix windows and doors with no provision for glass as in the photo • Provide and preposition the following items in the center upon completion of construction work of the center in Atende: mates (3 pieces), plastic chairs-(25 pieces) and big plastic tables (2 pieces). See attached photos

KL@Kuol Lueth Kuol Yai
Pon un delfín cerca de la tabla de surf integrandolo con el mar
nano-banana

Pon un delfín cerca de la tabla de surf integrandolo con el mar

JC@Josefa Calzado
quiero que pongas este pantalon en un maniqui con un fondo de una pared beige y un suelo de parqué antiguo
nano-banana

quiero que pongas este pantalon en un maniqui con un fondo de una pared beige y un suelo de parqué antiguo

AT@Abril Tejedor
сделай задний фон белым
nano-banana

сделай задний фон белым

ВТ@Владислав Тоцин
1…10…20
1…91011…20
Banana Pie

Empowering creators with the most intuitive AI tools on the web. Made with love and potassium.

Product

ModelsModel LabPricingGallery

Free Tools

Background RemoverImage CompressorImage ResizerImage Format ConverterImage CropperEXIF StripperImage to PDFQR Code GeneratorPDF to ImageAI Image UpscalerImage to Text (OCR)Depth Map GeneratorObject DetectorImage SegmenterAll Free Tools →

Company

BlogContact

Legal

TermsPrivacyRefunds

© 2026 Banana Pie. All rights reserved.

All Systems Operational